For the complex and detailed interim repair to have been completed in this timeframe is a tribute to the highly skilled and dedicated staff who have worked 24/7 since December 3rd.

Since the closure was put in place, weather conditions have been mainly favourable and the team have been able to complete the repair work in good time.

Notice: get_currentuserinfo is deprecated since version 4.5.0! Use wp_get_current_user() instead. in /srv/rope-and-rail.com/public/htdocs/wp-includes/functions.php on line 3840
Visit Us On Twitter Visit Us On Facebook Visit Us On Linkedin